Is switching the Massey crossing back to a bridge worth scrapping a tunnel already underway?
A Daily Hive article reports that Ottawa is backing the provincial pivot, led by Doerkson, to a new 10-lane George Massey Bridge instead of the tunnel replacement. The thread drew around 300 comments in r/britishcolumbia. Most of the debate centred on why the previously chosen tunnel, now under construction, would be dropped, and whether a bridge makes sense given the site's geology, cost and traffic patterns.
What people are saying:
• The most upvoted view recalls an independent technical review under the previous NDP government that cited deep silt with no nearby bedrock, earthquake liquefaction and cable-stay risks, concluding a tunnel was safer and more practical.
• Many commenters lamented money lost when projects are cancelled after consultants have done most of the work, and called for safeguards against mid-project reversals after leadership changes.
• One commenter cited a building trades release saying tunnel crews have been on site since January building a casting basin, access roads and a bridge to Deas Island, arguing cancellation would cost jobs and contract payouts.
• Several pointed out that a 10-lane bridge would still feed into 6-lane or narrower highways on either side, so congestion relief is doubtful.
• A minority said the bridge would already be open if the original plan had continued and that the NDP misjudged this, while predicting the new bridge will be tolled.
• Others noted the federal position is really support for whatever crossing the province picks, which they considered reasonable.
Bottom line: Tunnel construction is already underway, so watch for the province's updated engineering findings, cost estimates and contract decisions before assuming a bridge will actually be built.
Digest of a public discussion