NASA's moon landing plan delayed: Artemis 3 becomes a low Earth orbit test

欲神蠢望6 replies522 viewsFrom the old VanHere forum
Machine-translated from Chinese.

NASA has announced that the “Artemis 2” crewed lunar flyby mission has passed its flight readiness review, launch preparations continue, and liftoff is currently tentatively set for April 1 or later. The mission will use the brand-new Space Launch System with the Orion spacecraft to send 4 astronauts into lunar orbit for a loop around the moon. It was originally set to depart in February this year, but two integrated rehearsals both ran into technical problems, so it has been delayed again and again. Under the original plan, “Artemis 3” was to carry out the crewed moon landing next year, but because of frequent problems, NASA changed course at the end of February: “Artemis 3” will first be adjusted into a low Earth orbit test mission, and the actual crewed landing will be pushed back to “Artemis 4,” with the date moved all the way to 2028.

Posts are written by users and not reviewed by VanHere.

Replies6

  1. Power604#2

    This delay is really disheartening. It's not the first time NASA's SLS has dragged on.

  2. I saw a model of Orion at a sci-fi expo in Richmond. Never thought the real thing would still have so many problems.

  3. 旧时光#4

    SpaceX's Starship is progressing fast. Feels like NASA's progress can't keep up with the pace.

  4. Design604#5

    After waiting this long, I really fear everyone will lose their enthusiasm for the moon landing.

  5. A classmate at UBC says their lab is busy with other projects now, and tight budgets are slowing progress.

  6. 2028... By then I'll have to watch the livestream with my kids.