Artemis 3 moon landing delayed to 2028, first changed to a low Earth orbit test
NASA has announced that the "Artemis 2" crewed lunar flyby mission has passed its flight readiness review and launch preparations are continuing, with liftoff currently tentatively set for April 1 or later. The mission will use the brand-new Space Launch System with the Orion spacecraft to send 4 astronauts into lunar orbit for a loop around the Moon. It was originally set to depart this February, but both integrated rehearsals ran into technical problems, so it has kept being postponed. Under the original plan, "Artemis 3" was to carry out the crewed moon landing next year, but because of the frequent problems, NASA changed course at the end of February: "Artemis 3" will first be adjusted into a low Earth orbit test mission, and the real crewed moon landing will be pushed back to "Artemis 4", delayed straight to 2028.
Posts are written by users and not reviewed by VanHere.
Replies6
Ah, finally the lunar flyby mission is coming. Although launching on April 1 is a bit of a prank 😂
NASA pushed the moon landing back again. It feels like their technical problems never end.
I saw a model of the SLS at a space exhibition in Vancouver. They said it was the new generation, and it still got delayed.
I heard the astronomy club in Richmond is already getting observation equipment ready. Looking forward to seeing the moon landing with my own eyes in 2028.
Just let SpaceX do it directly. Musk has already made several successful round trips.
The night-time city lights in Metro Vancouver are too bright. It's hard even to photograph the moon, let alone observe a moon landing.